Case Studies

Atrium Refurbishment Projects

Real projects delivered across the UK. From emergency glazing repairs to full atrium refurbishments, see how we solve complex overhead glazing challenges for commercial buildings.

Retail

Shopping Centre Atrium Refurbishment — Swindon

A major shopping centre in Swindon was experiencing widespread water ingress through its 2,400m² barrel-vault atrium roof. The glazing system, installed in the early 1990s, had reached end-of-life on ...

Swindon, UK2,400m²12 weeks
Read case study
Corporate

Corporate HQ Glass Replacement — London

A major corporate headquarters in the City of London identified 23 laminated glass units in their central atrium showing advanced delamination. At 30m height above a busy reception and meeting area, t...

London, UK650m²6 weeks
Read case study
Public Sector

Civic Building Atrium Overhaul — Manchester

A civic building in central Manchester required a complete overhaul of its 900m² atrium glazing system, originally installed in 1993. The aluminium framework had suffered significant corrosion due to ...

Manchester, UK900m²16 weeks
Read case study
Education

University Multi-Building Atrium Survey — Leeds

A major university in Leeds required condition surveys of 8 separate atrium structures across their campus, ranging from 200m² to 1,800m² in area. The buildings dated from the 1980s to the 2010s, with...

Leeds, UK6,200m² (total across 8 buildings)4 weeks
Read case study
Retail

Retail Portfolio Maintenance Contract — Nationwide

A major property management company responsible for 12 shopping centres across the UK was experiencing frequent emergency call-outs for atrium glazing leaks and failures. The reactive approach was exp...

Nationwide, UK18,000m² (total across 12 sites)Ongoing (3+ years)
Read case study